skip to content

Centre for Digital Built Britain completed its five-year mission and closed its doors at the end of September 2022

This website remains as a legacy of the achievements of our five-year foundational journey towards a digital built Britain
 
Read more at: Publication: Final Report - Integrated Management of Margins through Evaluation, Design, Analysis, Tracking and Negotiation

Publication: Final Report - Integrated Management of Margins through Evaluation, Design, Analysis, Tracking and Negotiation

10 July 2019

immediate.png Project background Over-engineering of systems is an often-hidden source of inefficiency in systems, which can add significantly to their building and running costs, and reduce the sustainability of systems. One cause of over-engineering is a cumulative effect of different stakeholders adding margins to the...


Read more at: Publication: Final Report - Ancillary Sensing for Building Information Modelling: Current Practice and Future Research

Publication: Final Report - Ancillary Sensing for Building Information Modelling: Current Practice and Future Research

10 July 2019

screenshot_2020-07-01_at_17.29.00.png Project background The goal of this project is to develop two separate current frameworks for practice, policy and future research under the umbrella theme of ancillary (additional) sensing for BIM. Ancillary sensing in the context of BIM concerns drawing new sources of useful...


Read more at: Publication: Final Report - The Edge: Showcasing an exemplary IoT building

Publication: Final Report - The Edge: Showcasing an exemplary IoT building

10 July 2019

screenshot_2020-07-06_at_14.06.09.png Project background This project developed a case study of The Edge in Amsterdam, billed as the world’s smartest building, for CDBB. This was not only for the sake of sharing this specific case, but also to use it as a template to build the “standard case study template.” When we...


Read more at: Publication: Final Report - Aerial Swarm Robotics for Active Inspection of Bridges

Publication: Final Report - Aerial Swarm Robotics for Active Inspection of Bridges

10 July 2019

screenshot_2020-07-01_at_17.23.50.png Project background Bridge collapses are expensive and often tragic events that need to be avoided by detecting faults early. This project aims to create a coordinated aerial swarm system to inspect the cracks in bridge structures, improving the monitoring coverage and efficiency...


Read more at: Publication: Final Report - PolyChora Alpha: a new digital interface for interdisciplinary city design

Publication: Final Report - PolyChora Alpha: a new digital interface for interdisciplinary city design

10 July 2019

screenshot_2020-07-01_at_17.16.41.png Project background The aim of this project was to develop a new digital interface to integrate the data and visualisation of the designs of land use, buildings, transport infrastructure and associated urban services at both the neighbourhood and city scale. The interface can also be...


Read more at: Publication: Final Report - Feasibility of an Operating System for Interspatial Networking in a Built Environment

Publication: Final Report - Feasibility of an Operating System for Interspatial Networking in a Built Environment

10 July 2019

screenshot_2020-07-01_at_17.09.44.png Project background Osmose is a project aimed at building a new operating system for situated environments that can handle the demands of thousands of sensors and actuators that need to run in a coordinated and highly reliable fashion. Outomes Digital infrastructure in modern urban...


Read more at: Publication: Final Report - Open ML Training Data For Visual Tagging Of Construction-specific Objects (ConTag)

Publication: Final Report - Open ML Training Data For Visual Tagging Of Construction-specific Objects (ConTag)

10 July 2019

screenshot_2020-07-01_at_15.59.13.png Project background ML technology has enabled a revolutionary leap in many digital economies generating growth in activity and business mainly for the ITC sector. Part of the growth is generated through sharing of IP, knowledge, tools and datasets. We want to adopt this approach for the...


Read more at: Publication: Final Report - From Norm to Swarm: development of a balanced scorecard for evaluating automation in construction

Publication: Final Report - From Norm to Swarm: development of a balanced scorecard for evaluating automation in construction

10 July 2019

screenshot_2020-07-01_at_15.45.33.png Project background This project aims to develop a Balanced Score Card (BSC) to support the adoption of automation in construction. It will do this by delivering a set of indicators that ensure the sustainable development of these innovative processes and technologies in the UK...


Read more at: Publication: Final Report - Digital Energy Estimation Tool (DEET)

Publication: Final Report - Digital Energy Estimation Tool (DEET)

10 July 2019

screenshot_2020-07-01_at_15.28.01.png Project background How can buildings’ energy use and embodied energy both be optimized at the design stage? This project aims to enable the generation of real-time data from operational energy use and from energy embedded in building components. It will do this through 3-D computing...


Read more at: Publication: Final Report - A digital twin prototype for journeys to work in Cambridge

Publication: Final Report - A digital twin prototype for journeys to work in Cambridge

10 July 2019

screenshot_2020-06-30_at_22.17.11.png Project background This project represents an early trial to address the research gap on city-level digital twins. The pilot is focused on commutes, such as journeys to work, which are a key determinant of peak-time travel demand. It aims to develop a digital twin model prototype for...